Skip to content

Updating visuals

If you see any images containing outdated UI, please bear with us.

We are updating all content as quickly as possible to mirror our new UI.

Frequently asked questions ​

This article addresses our most frequently asked questions. If you need help with something we haven't covered here yet, don't hesitate to reach out to our support team.

Backend & integrations ​

Can WeWeb build my backend?

Yes. WeWeb includes a built‑in Data & API tab where you can design tables, create views, build APIs, and manage users and roles directly inside the editor. This means you can handle your app's backend (data storage, authentication, middleware, and integrations) without leaving WeWeb. Of course, you're still free to use any external backend or API of your choice – in Data & API you can connect to services like Supabase, Xano, Airtable, and others through APIs or dedicated integrations.

Does WeWeb work with other no-code backend tools?

Absolutely. WeWeb was built to seamlessly integrate with other popular no-code and backend tools. In the Data & API tab you can connect to services like Xano, Airtable, Supabase, Google Sheets, and any REST API by creating tables that use external data or by building APIs. You can quickly turn these connections into data sources for your interface (for example, by binding a view or an API to a list). If a specific integration isn't available out-of-the-box, you can still call almost any backend that exposes an API by configuring an HTTP-based API.

Can I make an external API request in WeWeb?

Yes. You can call and process an external API endpoint through the Data & API tab by creating an API (for example with the HTTP request action) and then using the Call API action from your interface. You can either return the response directly to your page or save it into a table if you want to reuse the data later. Learn more about APIs.

Scaling & performance ​

What are WeWeb's limits in terms of app complexity or size?

There are no fixed limits on app complexity imposed by WeWeb itself. You can design pixel-perfect UIs, add complex logic, and even include custom code – essentially, anything possible with standard web technologies can be done in WeWeb. There's no hard cap on the number of pages or components, for instance, aside from practical considerations (extremely large projects might become harder to manage, just like in any development). In short, WeWeb doesn't limit your creativity or scale: if you need something not built-in, you can extend it, and your app can grow as large as needed (just ensure your backend/APIs can handle the data and traffic).

What if I need more capacity or features beyond my plan's limits?

WeWeb's plans are designed to cover most use cases, but if you find you need more (be it more file storage, additional projects, more team seats, or even specific features), you have options. For slightly higher needs, you can upgrade to a bigger plan. If you truly exceed all standard plans, you can reach out to us for a custom solution. We can often accommodate special requests (for example, extra storage or custom development work) on a case-by-case basis via an enterprise agreement. In summary, you're not stuck if you outgrow a plan – we will work with you to support your growth.

WeWeb platform & infrastructure ​

How and where is WeWeb hosting my application?

WeWeb hosts all projects on Amazon Web Services (AWS) cloud servers, specifically in an AWS region in Northern Virginia, USA (us-northeast). Every published project is distributed via CloudFront CDN, which means your app is cached on servers around the world for fast access. This setup provides robust reliability and speed. If your users are global, they'll load your app from whichever edge location is nearest to them. In terms of data: any user-uploaded files (if using WeWeb's hosting for assets) would also reside on AWS. Security and uptime are managed by WeWeb's infrastructure on AWS.

Data ownership & self-hosting ​

Who owns my data?

You do. All the data in your WeWeb application – including any data your end-users provide – is owned by you (or your business). We don't claim ownership of your data. If you're using external backend services, you'll likewise retain ownership as per those services' terms. Our role is to provide the platform and hosting; your app's data remains yours, and you can export or remove it as needed.

Can I export my app and host it on-premise?

Yes! WeWeb supports full code export of your projects. Starting from the Essential plan, you can export the raw code (HTML, CSS, and JavaScript) as well as the compiled application (Vue.js). You can then deploy the compiled application on any hosting environment (your own server, AWS, Netlify, Cloudflare, etc.). This is often used for self-hosting or to integrate into a specific DevOps pipeline. Keep in mind, after export, the WeWeb editor won't reflect changes made directly in code, but you can always re-export after editing in WeWeb.

Learn more about code export and self-hosting here.

Development ​

I'm not a developer. Can I still build apps with WeWeb?

Absolutely! WeWeb is designed to be accessible to users without traditional development backgrounds. Some of our most advanced and successful users started with little to no coding experience. WeWeb's visual drag-and-drop interface, intuitive workflows, AI assistant, and human support make it possible for anyone to create sophisticated web applications. While having some technical knowledge can be helpful, it's certainly not required to get started and build impressive projects with full control.

Can I see the code that my WeWeb frontend is being hosted on?

You can view the generated frontend code, but not directly edit it within the WeWeb editor. In the browser's developer console, you can inspect the HTML/CSS/JS that WeWeb produces for your app. And if your plan supports code export, you can download the code and inspect it in your own IDE. However, WeWeb is not a low-level code editor, so you cannot modify the source code from inside the platform – any changes should be done through the visual editor or by exporting the project. (This ensures consistency, since manual code edits aren't synced back to the WeWeb editor.)

Can I import my HTML & CSS to WeWeb?

You cannot import a full codebase or site directly into WeWeb. WeWeb isn't an HTML/CSS parser; instead, you rebuild your frontend within WeWeb's editor. However, WeWeb gives you flexibility to reuse code in other ways: you can add custom code snippets at the page or project level (for things like scripts or styles), and you can import custom Vue.js components from your own code repository to use within WeWeb. So while you can't drag-and-drop import a whole site's HTML/CSS, you can integrate pieces of custom code or build components to achieve the same design/functionality within WeWeb.

Can I migrate my frontend from another FaaS (Frontend as a Service) provider?

Currently, there isn't an automated way to migrate a full app from another no-code or frontend platform into WeWeb. This is largely because each platform has its own structure and format, which are not directly compatible. If you're switching to WeWeb, you will need to recreate your frontend in WeWeb's editor. The good news is that WeWeb's flexibility usually lets you rebuild any design or functionality, and you can copy over assets or use custom code where needed. But an import tool or one-click migration from other services is not available at this time.

Can I hire a WeWeb expert to help develop my custom frontend?

Yes. WeWeb partners are referenced here.

Templates & AI ​

Will WeWeb have templates or a marketplace to jump-start projects?

Yes, a WeWeb Marketplace is available. It offers pre-built templates and components that you can use to start your projects faster. Template support is growing – if you're starting a project, you can expect an increasing number of ready-made layouts or blocks to be available to use.

Can I develop my own plugin or sell extensions on WeWeb's marketplace?

Yes. You can create reusable assets such as templates, components, and integrations and offer them through the WeWeb Marketplace. You build these using WeWeb’s editor and, if needed, developer features such as custom components. For the latest details on how to publish to the marketplace or participate as a partner, check the Marketplace documentation or reach out to our team.

If I can't find a suitable template in the marketplace, can I upload screenshots of my favorite design to the AI?

Yes, our AI will generate designs based on your screenshots. If you have a design you love from another website or application, you can upload screenshots to WeWeb AI and it will attempt to recreate similar layouts and styling for your project. You can always tweak the design using our visual drag-and-drop editor.

Pricing ​

How much will WeWeb cost and how do I upgrade?

Pricing depends on which plan you choose. For detailed information on the cost of each plan and what is included, please visit https://weweb.io/pricing. In order to upgrade, please visit the Billing page in your WeWeb dashboard and select "Upgrade"

Does WeWeb charge per end-user?

No, WeWeb does not charge per end-user.

Can I create a custom plan with WeWeb?

Yes. This can be done by contacting us and inquiring about our custom enterprise setup.

For more pricing questions, feel free to check our pricing plans article.

Support ​

On which plans is human support available?

You can get direct support from a WeWeb team member on all plans. Our support team will help you with any technical issues related to WeWeb. Please note that we focus specifically on WeWeb-related questions and may not always be able to provide support for third-party services or integrations.

Is there a community forum for user discussions?

Yes, we have an active community forum where users share knowledge, ask questions, and showcase their projects. You can join the conversation at https://community.weweb.io/.

Can I schedule a call with support?

We don't currently provide technical support through calls, but we do provide one-time onboarding sessions for new users where we walk you through getting started with WeWeb. Additionally, we host weekly office hours every Tuesday at 6 PM Paris time on our YouTube channel, where you can join live and ask questions directly to our team.

Account management ​

How to reset my password?

You need to sign out and click on "Forgot password".

Can I put a hold on or pause my account?

If you need to put a hold on things by canceling your subscription and wish to come back later, WeWeb can preserve your data for up to 90 days from the end of your subscription. You must contact support to do so. After you cancel, you will not be able to access your workspace. When you are ready to come back, you must contact support again and re-initiate payment on your subscription to access your workspace. After the 90 day grace period your data and workspace could be lost and you may have to start over from scratch.

Can I get a refund on my paid plan?

WeWeb does not allow refunds of any kind on its monthly paid plans. You can choose to cancel or downgrade your Workspace and/or Project subscriptions at any time.

To downgrade a Workspace plan: ​

  1. Select your workspace
  2. Go to the Members tab of your workspace
  3. Click on downgrade to message us your request. We will process it promptly.

Downgrade a workspace plan

To downgrade a Project plan: ​

  1. Go to the Plans tab of the project
  2. Click on downgrade to message us your request. We will process it promptly.

Downgrade a project plan

Team collaboration ​

Does WeWeb work with Agencies?

Absolutely! We have a plan specifically tailored towards dev shops, freelancers and agencies. WeWeb partners are referenced here.

Can I collaborate with others on a project in WeWeb?

Yes. Development can work better if a team is involved. Team collaboration is available starting from the Pro plan, which allows unlimited seats. Each additional team member you invite will require their own seat subscription. However, if the person you're inviting has a Partner plan, you can invite them to your workspace free of charge. You can grant access to other teammates to your workspace and work simultaneously on a project together.

Compliance ​

Can I satisfy GDPR Compliance while using WeWeb as my frontend?

Yes. WeWeb and its underlying infrastructure provider (AWS) provide the necessary tools and safeguards to support GDPR compliance.

However, it is crucial to recognize that a significant portion of the responsibility lies with the application itself. By adhering to the key GDPR requirements and fulfilling their respective obligations, application builders can create robust and privacy-conscious solutions using a tool like WeWeb.

Can I satisfy HIPAA Compliance while using WeWeb as my frontend?

Yes. If you use a HIPAA-compliant backend and connect to it through APIs in the Data & API tab, you can design your project so that sensitive health data is stored and processed only in that backend. In that setup, WeWeb handles the interface and routing while you keep protected data in your own systems; as always, you are responsible for configuring your backend, data flows, and contracts so that the overall solution meets HIPAA requirements.

Will my data transit through your infrastructure?

It depends on how you set up your backend in the Data & API tab and which external services you use.

When you store data in WeWeb tables or upload files, that information is hosted on our infrastructure (AWS), because we manage that database and file storage for you.

When your interface calls your own external backend through APIs and you choose not to store the responses in WeWeb tables, most data processing happens in your own backend. Some minimal data may still pass through WeWeb's infrastructure to deliver responses and logs.

If you generate static pages that include pre-fetched data, that content is stored and cached on our hosting (for example on CloudFront) just like any other static site.

SEO ​

How does WeWeb compare to other tools for SEO?

It depends on the tool! Historically, static website builders like Webflow and builders with server-side rendering (SSR) like WordPress had an SEO advantage over tools like WeWeb, Bubble, and others that generate dynamic content in JavaScript.

This happens because when search engine bots first visit a JavaScript application, they initially see only the base HTML file before any JavaScript runs. In dynamic applications like WeWeb, this base file is nearly empty since all content is added later by JavaScript running in the browser. By contrast, static/SSR sites deliver complete HTML with all content already included.

However, in recent years, search engines have significantly evolved to better handle JavaScript content, as more websites are built with modern JS frameworks like React or Vue. While the initial indexing might take a few extra days compared to static sites, search engine bots now effectively crawl and index JavaScript-based content during subsequent visits.

Here are Google's thoughts on the topic:

Google on dynamic content

Is WeWeb suitable for large marketplaces?

Yes. While dynamic JavaScript applications have some SEO tradeoffs, many major marketplaces successfully use similar JavaScript-based architectures. The key is understanding that search indexing may take longer initially, but this is rarely a significant barrier for marketplace success which often depends more on:

  • Product/service quality
  • User experience
  • Marketing strategy
  • Network effects
  • Direct traffic
What can I do to help my WeWeb pages rank well in search engines?

There are many things you can do on your WeWeb apps that will improve its Lighthouse scores and, most importantly, the user's experience (both of which influence SEO rankings).

  1. Follow SEO best practices when building:
  • Add titles & metadata to all your pages
  • Add alt text on all your images
  • Use headings for titles
  • Use elements with the correct HTML tags (e.g. buttons, select, etc.)
  1. Don't load too much data on the page:
  • Compress images
  • Keep your pages short and simple
  • Avoid superfluous nested containers
  • Add backend filters on big sets of data
  • Fetch collections only when you need them
  • Use multi-page sections to avoid reloading data the user has already loaded
  • Minimize unecessary custom scripts